INSP-Final Inspection | 5/10/2013 | 5/10/2013 | 5/10/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 5/1/2013 | 5/1/2013 | 5/2/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover at the drop ceilings.
|
Issue and Print Permit | | | 4/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 4/8/2013 | | 4/8/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 4/5/2013 | | 4/5/2013 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 4/5/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/5/2013 | | 4/5/2013 | | PASS |
Tim Frost
|
|
|
|
Application received | | | 4/4/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 4 2013 6:17PM
|