INSP-Final Inspection | 5/17/2013 | 5/20/2013 | 5/21/2013 | P | PASS |
Forrest France
|
|
|
Scope of fire alarm work passed field inspection and testing. Plan modification completed, correction items finished.
|
Permit Ready to Issue | | | 5/17/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/17/2013 | | DONE |
Christina Prado
|
|
|
|
Alarm Plan Check | 5/16/2013 | | 5/16/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved - see review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 5/16/2013 | | DONE |
|
|
|
updated in project dox
|
Miscellaneous action | | | 5/14/2013 | | DONE |
|
|
|
Per Boise Fire Marshal, the request for TCO has been denied until fire alarm permit is reissued and the fire alarm work performed has been inspected and tested.
|
INSP-Final Inspection | 5/7/2013 | 5/7/2013 | 5/7/2013 | A | FAIL |
Forrest France
|
|
|
Provide plan modification reflecting field changes including removal of all devices from the existing panel, relays to mag locks, adjustments to notification and initiating devices necessary due to field inspection notes.
|
INSP-Final Inspection | 5/3/2013 | 5/6/2013 | 5/7/2013 | P | CANC |
Troy Cobbley
|
|
|
Call for access Phone #: 2089411846 >> Inspection requested via mobile web by Brian Anderson
|
CHANGE STATUS TO (REV) | | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
Per Dante plan mod requested
|
Plan resubmittals received | | | 5/7/2013 | | DONE |
|
|
|
Plan modification received
|
Telephone call | | | 5/3/2013 | | DONE |
|
|
|
Spoke with John Hatten of CSHQA. John mentioned that the FACP will need to be replaced as part of the permit. I advised John that a Plan Modification will be required for the existing permit in order to expand the existing scope of work to include the FACP replacement.
|
Permit Ready to Issue | | | 4/24/2013 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 4/24/2013 | | 4/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Alarm Plan Check | 4/23/2013 | | 4/23/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved as noted - the existing panel is NOT to be removed under this permit.
|
PLANS TAKEN FRONT DESK ALARM | | | 4/23/2013 | | DONE |
|
|
|
updated in project dox
|
Plan resubmittals received | | | 4/18/2013 | | DONE |
|
|
|
Resubmittals received
|
Miscellaneous action | | | 4/17/2013 | | DONE |
|
|
|
Received clarification that there is an upgrade agreement (I attached it to the case)
|
1st review completed | | | 4/16/2013 | | FAIL |
|
|
|
|
Alarm Plan Check | 4/16/2013 | | 4/16/2013 | | FAIL |
Stephanie L. Cobbley
|
|
|
Scope indicates FACP replacement. Only portions of the building system were shown. I explained to the applicant (via project dox) that due to the replacement, the system must meet current code requirements. I could not verify this with the majority of the building hatched out with no devices shown (only a note stating it is an occupied area). A review could not be done at this time. There are no written review comments.
|
Plan assigned to (Stephanie) | 4/9/2013 | | 4/9/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Application received | | | 4/8/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 8 2013 4:18PM
|