INSP-Final Inspection | 6/4/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/4/2013 | 6/4/2013 | 6/4/2013 | P | PASS |
Troy Cobbley
|
|
|
Hydro test and sprinkler rough-in passed. As-builts have been provided.
|
Sprinkler Plan Check | 4/18/2013 | | 4/18/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/18/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/18/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 4/18/2013 | | 4/18/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 4/18/2013 | | |
|
|
|
|
Plan assigned to (Tim) | 4/17/2013 | | 4/17/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/16/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 16 2013 2:11PM
|