INSP-Final Inspection | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Sprinkler piping is ok to cover. Two pendants. in two locations, are located too close to one another and will need to be relocated. Will be checked at final.
|
Issue and Print Permit | | | 4/29/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/22/2013 | | 4/24/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/24/2013 | | 4/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/24/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
called Curtis to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 4/24/2013 | | 4/24/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 4/22/2013 | | |
|
|
|
|