INSP-Final Inspection | 3/21/2014 | 3/24/2014 | 3/24/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
INSP-Sprinkler Rough-in | 3/12/2014 | 3/13/2014 | 3/13/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for location where piping can be covered with todays date.
|
INSP-Sprinkler Rough-in | 12/2/2013 | 12/3/2013 | 12/3/2013 | A | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Plans need to be resubmitted addressing the pipe size that does not match the approved plans.
|
Permit Ready to Issue | | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/7/2013 | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 5/2/2013 | | 5/2/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/2/2013 | | 5/2/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/2/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 4/29/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 29 2013 2:14PM
|