INSP-Final Inspection | 6/20/2013 | 6/20/2013 | 6/20/2013 | P | PASS |
Forrest France
|
|
|
Scope of permit work completed. Final walkthrough passed.
|
INSP-Sprinkler Rough-in | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Sprinkler Plan Check | 5/3/2013 | | 5/3/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/3/2013 | | 5/3/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 5/2/2013 | | 5/2/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/2/2013 | | 5/2/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/2/2013 | | FAIL |
|
|
|
|
Application received | | | 5/1/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 1 2013 10:20AM
|