INSP-Final Inspection | 5/29/2013 | 6/3/2013 | 6/3/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for completion, plan modifications recieved, final inspection passed. Fire alarm permit finaled.
|
Telephone call | | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
Called to advise Sherry permit is ready and gave fees due
|
Permit Ready to Issue | | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/29/2013 | | 5/29/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Stephanie) | 5/20/2013 | | 5/28/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 5/28/2013 | | 5/28/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 5/28/2013 | | DONE |
|
|
|
approved plan modifications taken to permit technician for processing.
|
Plan resubmittals received | | | 5/20/2013 | | |
|
|
|
5-20-13 received 2 applications/plans (plan mod) sent to SLC
|
INSP-Final Inspection | 5/15/2013 | 5/17/2013 | 5/17/2013 | A | FAIL |
Forrest France
|
|
|
Correction notice items include; provide WP notification appliances at rooms 118 and 119, MP at the riser needs to be between 42" and 48" AFF per note #33, new wall at hall 111 will require additional coverage, remove existing A/V at the fire riser room, post accurate points map at the panel per note # 51, post signage per note #53, relay for sound system shutdown did not function. Plan modification needed due to six existing duct detectors and one hood monitor not included on approved plans. Revise matrix to include sound relay. Revise one-line diagram to include all building duct detectors and initiating devices.
|
Telephone call | | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 5/15/2013 | | 5/15/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 5/15/2013 | | DONE |
|
|
|
|
Telephone call | | | 5/14/2013 | | DONE |
Scott Arellano
|
|
|
Crane Alarm called to check to status of this permit. Emailed Brent Crane informing him that his plan is next inline for review.
|
1st review completed | | | 5/14/2013 | | PASS |
|
|
|
|
Alarm Plan Check | 5/14/2013 | | 5/14/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 5/14/2013 | | DONE |
|
|
|
Plans taken to permit technician for processing.
|
Plan assigned to (Stephanie) | 5/2/2013 | | 5/14/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 5/2/2013 | | DONE |
Scott Arellano
|
|
|
Early Start Request approved. See attached document for conditions.
|
Application received | | | 5/2/2013 | | |
|
|
|
|