Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 5/14/2013 | 5/16/2013 | 5/16/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | PASS |
Troy Cobbley
|
|
|
Insulation has been repaired. Piping can be covered.
|
INSP-Sprinkler Rough-in | 5/10/2013 | 5/13/2013 | 5/13/2013 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler rough-in passed. In two areas insulation needs to be secured to the roof deck that is obstructing the upright sprinkler coverage. This work will need to be done prior to a final sign off.
|
Plan assigned to (Tim) | 5/8/2013 | | 5/9/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/9/2013 | | 5/9/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/9/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 5/9/2013 | | 5/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 5/9/2013 | | DONE |
Barbara Stitt
|
|
|
Called and told them that permit is ready and fees due on 5-9-13 @ 9:50am///BAS
|
Issue and Print Permit | | | 5/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 5/2/2013 | | 5/8/2013 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 5/8/2013 | | |
|
|
|
5-8-13 received 3 applications and plans sent to Tim F.
|
Telephone call | | | 5/7/2013 | | DONE |
Christina Prado
|
|
|
called and left message with Shilo advising failed plans are here for pick up and resubmittals are needed
|
Sprinkler Plan Check | 5/6/2013 | | 5/6/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/6/2013 | | FAIL |
|
|
|
|
Miscellaneous action | | | 5/6/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Case Summary | | | 5/2/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/2/2013 | | |
|
|
|
|