INSP-Final Inspection | 5/17/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/8/2013 | 5/9/2013 | 5/9/2013 | A | PASS |
Troy Cobbley
|
|
|
overhead cover inspection passed for the most part and the piping can be covered. The only issue is the 9' rule is being used off of two walls which is not allowed. Revised head spacing will be checked at final.
|
Application received | | | 5/7/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 7 2013 11:50AM
|
Plan assigned to (Tim) | 5/7/2013 | | 5/7/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/7/2013 | | 5/7/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 5/7/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 5/7/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 5/7/2013 | | 5/7/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 5/7/2013 | | DONE |
|
|
|
|