INSP-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit approved for final status.
|
INSP-Final Inspection | 8/7/2013 | 8/12/2013 | 8/12/2013 | A | PART |
Forrest France
|
|
|
Completed trip testing, forward flow and final walkthrough.
|
INSP-Supply line flush | 8/5/2013 | 8/7/2013 | 8/7/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 7/24/2013 | 7/24/2013 | 7/26/2013 | P | PART |
Forrest France
|
|
|
Okay to cover grid ceilings at the 1st and 2nd floors.
|
INSP-Sprinkler Rough-in/Hydro | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | PART |
Forrest France
|
|
|
Overhead rough-in at the grid ceilings SW corner approved for cover. Also completed overhead hydrostatic test of the new wet system.
|
CHANGE STATUS TO (ISS) | | | 7/19/2013 | | DONE |
Tisha Gallop
|
|
|
plan mod approved and paid for
|
Sprinkler Plan Check | 7/18/2013 | | 7/18/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2013 | | DONE |
Tim Frost
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2013 | 7/17/2013 | 7/17/2013 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Sprinkler Rough-in/Hydro | 7/15/2013 | 7/16/2013 | 7/16/2013 | A | PART |
Forrest France
|
|
|
Begin 24 hr air test of the new dry system at 10:30 AM @ 47psig.
|
INSP-Sprinkler Rough-in | 7/15/2013 | 7/15/2013 | 7/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was a rough-in for the whole system. See locations circled in red where the sprinkler protection at the unit heaters has not been installed. Per Tim the EFSR heads located under/in the smoke vents are ok more than 18" from the deck. Per the drawings no earth quake bracing/retaining straps are required and none are installed. I did not look at the riser. The overhead hydro test of the dry system passed. A plan modifiction is required for the piping changes in the north office area and the heads under the overhead doors.
|
INSP-Sprinkler Rough-in | 6/17/2013 | 6/17/2013 | 6/17/2013 | P | PART |
Forrest France
|
|
|
Remainder of UG fire supply line to the point of connection at the PL okayed to cover-
|
INSP-Sprinkler Rough-in | 6/4/2013 | 6/5/2013 | 6/6/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line to a point 100' from the stem wall okayed for bury as marked on approved plans (90 ell not included).
|
Sprinkler Plan Check | 6/4/2013 | | 6/4/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2013 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 6/4/2013 | | 6/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 5/21/2013 | | 5/21/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/21/2013 | | FAIL |
|
|
|
|
Plan assigned to (Tim) | 5/15/2013 | | 5/15/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 5/14/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 14 2013 12:42PM
|