INSP-Final Inspection | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PASS |
Forrest France
|
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 5/29/2013 | 5/30/2013 | 5/31/2013 | A | PART |
Forrest France
|
|
|
Overhead work okay for cover.
|
INSP-Sprinkler Rough-in | 5/29/2013 | 5/29/2013 | 5/30/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work above the grid ceilings okayed for cover.
|
Plan assigned to (Tim) | 5/17/2013 | | 5/17/2013 | | DONE |
Tim Frost
|
|
|
|
1st review completed | | | 5/17/2013 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 5/17/2013 | | 5/17/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/17/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Sprinkler Plan Check | 5/17/2013 | | 5/17/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 5/17/2013 | | 5/17/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 5/16/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 16 2013 3:13PM
|