Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PASS |
Forrest France
|
|
|
Verified plan modification to include additional SW heads at the entry vestibule. Field inspection passed, permit finaled.
|
Plan resubmittals received | | | 6/24/2013 | | |
|
|
|
6-21-13 received 3 plans and applications (plan mod) sent to Tim F.
|
Sprinkler Plan Check | 6/24/2013 | | 6/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/24/2013 | | |
|
|
|
This has nothing to do with the hold
|
Telephone call | | | 6/24/2013 | | |
|
|
|
6-24-13 called Don - Curtis Firesprinkler permit ready and fee given ///dld
|
Inspection Record Card- Fire | 6/24/2013 | | 6/24/2013 | | DONE |
Darla L Downs
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
planmod
|
INSP-Final Inspection | 6/20/2013 | 6/21/2013 | 6/21/2013 | A | NR |
Forrest France
|
|
|
Final pending additional coverage at the south entry vestibule.
|
INSP-Sprinkler Rough-in | 6/20/2013 | 6/20/2013 | 6/20/2013 | A | PART |
Forrest France
|
|
|
Scope of work passed inspection- However, noted missing coverage at the south entry vestibule on the existing system. Final pending plan mod to include adding required heads.
|
INSP-Sprinkler Rough-in | 6/19/2013 | 6/19/2013 | 6/20/2013 | P | DEFR |
Forrest France
|
|
|
|
Plan assigned to (Tim) | 5/28/2013 | | 6/3/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/3/2013 | | 6/3/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/3/2013 | | 6/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/3/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/3/2013 | | DONE |
Barbara Stitt
|
|
|
Called and left a message for Don that permit is ready on 6-3-13 @ 8:45am///BAS
|
Issue and Print Permit | | | 6/3/2013 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/30/2013 | | DONE |
Christina Prado
|
|
|
received three sets application, checklist and revised plans; taken to fire for further review
|
1st review completed | | | 5/29/2013 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 5/29/2013 | | 5/29/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 5/29/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 5/29/2013 | | DONE |
Tisha Gallop
|
|
|
called Don and told him denied plans at front desk.
|
Application received | | | 5/28/2013 | | |
|
|
|
|