Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 6/28/2013 | 6/28/2013 | 6/28/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit passed final walkthrough.
|
INSP-Sprinkler Rough-in | 6/10/2013 | 6/11/2013 | 6/11/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the 4th floor remodel area is approved for cover- no changes at the 3rd floor. Plans dated and initialed.
|
Issue and Print Permit | | | 6/10/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/30/2013 | | 6/7/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 5/30/2013 | | 6/7/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/7/2013 | | 6/7/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/7/2013 | | 6/7/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 6/7/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/7/2013 | | DONE |
Tisha Gallop
|
|
|
Called Don and told him permit is ready and fee.
|
Plan resubmittals received | | | 6/5/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of application and plans; routed to TRF.
|
Sprinkler Plan Check | 6/3/2013 | | 6/3/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 6/3/2013 | | FAIL |
|
|
|
|
Miscellaneous action | | | 6/3/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 6/3/2013 | | DONE |
Tisha Gallop
|
|
|
called Don and told him denied plans at front desk for pick up.
|
Application received | | | 5/30/2013 | | |
|
|
|
|