INSP-Final Inspection | 7/23/2013 | 7/24/2013 | 7/24/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 7/9/2013 | 7/9/2013 | 7/9/2013 | P | PASS |
Troy Cobbley
|
|
|
Piping can be covered in the lay-in tile area.
|
INSP-Sprinkler Rough-in | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | CANC |
Troy Cobbley
|
|
|
wrong permit called in
|
INSP-Sprinkler Rough-in | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PART |
Forrest France
|
|
|
See approved plans for clouded and dated areas okayed for sheetrock ceiling cover.
|
Plan assigned to (Tim) | 6/5/2013 | | 6/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/5/2013 | | 6/5/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/5/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/5/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 6/5/2013 | | 6/5/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 6/5/2013 | | DONE |
|
|
|
|
Application received | | | 5/31/2013 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2013 12:07PM
|