INSP-Final Inspection | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Sprinkler Rough-in | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PART |
Forrest France
|
|
|
Inspection for cold cavity protection completed, okayed to cover.
|
INSP-Sprinkler Rough-in | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | CANC |
Troy Cobbley
|
|
|
Tenting was not complete. No inspection was performed.
|
INSP-Sprinkler Rough-in | 6/13/2013 | 6/13/2013 | 6/17/2013 | P | PART |
Forrest France
|
|
|
Overhead rough-in inspection completed- field modifications to be reflected on as-builts. Cover approval pending verification of insulation for cold cavity protection.
|
Permit Ready to Issue | | | 6/10/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 6/10/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 6/10/2013 | | 6/10/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 6/7/2013 | | 6/7/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/7/2013 | | 6/7/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/7/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 6/4/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 4 2013 12:32PM
|