Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR13-00252
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 106 N CASTELLO PL
Project NameTierney Residence
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of a two level dwelling.

Plan Mod #1 - 3/10/2014
Added pump

Plan Mod #2 – 7/17/2015
Revised pump layout to comply with NFPA and changed pump.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  9/19/2016 DONE
INSP-Final Inspection8/5/20158/6/20158/6/2015PPASS
DetailsJim Page
Pump installed dedicated to the fire system, fire sprinkler inspection passed/complete
Plan assigned to (Tim)8/5/2015 8/5/2015 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/5/2015 DONE
DetailsTim Frost
CHANGE STATUS TO (ISS)  8/5/2015 DONE
modifications done; NO fees due
CHANGE STATUS TO (ISS)  4/23/2014 DONE
DetailsChristina Prado
Per Fire Section Supervisor, Case has been changed to issued so reinspection can be completed. Plumbing inspection revealed the installation of a potable water booster pump installed in a way which adversely affects the approved fire protection system design. Reconfiguration of the booster pump installation is required to accomodate specific sprinkler system hydraulic requirements.
INSP-Final Inspection3/17/20143/18/20143/20/2014PPASS
DetailsForrest France
Fire sprinkler permit finaled.
Sprinkler Plan Check3/10/2014 3/10/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2014 DONE
DetailsTim Frost
CHANGE STATUS TO (ISS)  3/10/2014 DONE
DetailsChristina Prado
INSP-Final Inspection2/5/20142/6/20142/5/2014ACANC
DetailsForrest France
jonathan Phone #: ###-#### // cancelled per Jonothan, will call back to reschedule 2/5/14 leg
INSP-Final Inspection10/21/201310/21/201310/21/2013PPART
DetailsForrest France
Tenting reinspection complete.
INSP-Sprinkler Rough-in10/17/201310/18/201310/18/2013AFAIL
DetailsForrest France
Tenting at four areas in need of adjustment- main entry, laundry room, and two locations in the garage.
INSP-Sprinkler Rough-in10/17/201310/17/201310/18/2013PNR
DetailsForrest France
jonathan - verify tenting Phone #: ###-#### *Noted several areas in need of adjustment to provide adequate cold cavity protection.
INSP-Sprinkler Rough-in10/7/201310/7/201310/7/2013PPART
DetailsTroy Cobbley
Need approved as-builts on site to verify approved installation. Need sprinkler coverage modified , as marked on plans, near kitchen and a lintel or additional head in the main floor northwest bathroom/shower. No piping can be covered until a tenting inspection is requested and passed.
INSP-Sprinkler Rough-in8/6/20138/6/20138/6/2013PPART
DetailsForrest France
UG fire supply line from the point of connection at the street to the stem wall okayed for bury.
Issue and Print Permit  8/6/2013 DONE
Inspection Record Card- Fire8/6/2013 8/6/2013 DONE
DetailsDarla L Downs
Permit Ready to Issue  8/6/2013  
Issue and Print Permit  8/6/2013 DONE
Sprinkler Plan Check7/15/2013 7/15/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  7/15/2013 DONE
DetailsTim Frost
Sprinkler Plan Check7/10/2013 7/10/2013 FAIL
DetailsTim Frost
Miscellaneous action  7/10/2013 DONE
DetailsTim Frost
Emailed review to contractor
Plan assigned to (Tim)6/10/2013 6/10/2013 DONE
DetailsTim Frost
Sprinkler Plan Check6/10/2013 6/10/2013 FAIL
DetailsTim Frost
Please, see attached comments.
1st review completed  6/10/2013 FAIL
DetailsTim Frost
Miscellaneous action  6/10/2013 DONE
DetailsTim Frost
Emailed review to contractor
Application received  6/7/2013 DONE
Application submitted via PDS Online on Jun 7 2013 9:37AM