Case Summary | | | 9/19/2016 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Jim Page
|
|
|
Pump installed dedicated to the fire system, fire sprinkler inspection passed/complete
|
Plan assigned to (Tim) | 8/5/2015 | | 8/5/2015 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/5/2015 | | DONE |
|
|
|
modifications done; NO fees due
|
CHANGE STATUS TO (ISS) | | | 4/23/2014 | | DONE |
Christina Prado
|
|
|
Per Fire Section Supervisor, Case has been changed to issued so reinspection can be completed. Plumbing inspection revealed the installation of a potable water booster pump installed in a way which adversely affects the approved fire protection system design. Reconfiguration of the booster pump installation is required to accomodate specific sprinkler system hydraulic requirements.
|
INSP-Final Inspection | 3/17/2014 | 3/18/2014 | 3/20/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
Sprinkler Plan Check | 3/10/2014 | | 3/10/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/10/2014 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/10/2014 | | DONE |
Christina Prado
|
|
|
|
INSP-Final Inspection | 2/5/2014 | 2/6/2014 | 2/5/2014 | A | CANC |
Forrest France
|
|
|
jonathan Phone #: ###-#### // cancelled per Jonothan, will call back to reschedule 2/5/14 leg
|
INSP-Final Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 | P | PART |
Forrest France
|
|
|
Tenting reinspection complete.
|
INSP-Sprinkler Rough-in | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | FAIL |
Forrest France
|
|
|
Tenting at four areas in need of adjustment- main entry, laundry room, and two locations in the garage.
|
INSP-Sprinkler Rough-in | 10/17/2013 | 10/17/2013 | 10/18/2013 | P | NR |
Forrest France
|
|
|
jonathan - verify tenting Phone #: ###-#### *Noted several areas in need of adjustment to provide adequate cold cavity protection.
|
INSP-Sprinkler Rough-in | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PART |
Troy Cobbley
|
|
|
Need approved as-builts on site to verify approved installation. Need sprinkler coverage modified , as marked on plans, near kitchen and a lintel or additional head in the main floor northwest bathroom/shower. No piping can be covered until a tenting inspection is requested and passed.
|
INSP-Sprinkler Rough-in | 8/6/2013 | 8/6/2013 | 8/6/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line from the point of connection at the street to the stem wall okayed for bury.
|
Issue and Print Permit | | | 8/6/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/6/2013 | | 8/6/2013 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 8/6/2013 | | |
|
|
|
|
Issue and Print Permit | | | 8/6/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/15/2013 | | 7/15/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/10/2013 | | 7/10/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/10/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Plan assigned to (Tim) | 6/10/2013 | | 6/10/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/10/2013 | | 6/10/2013 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/10/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/10/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Application received | | | 6/7/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2013 9:37AM
|