INSP-Final Inspection | 7/10/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 6/26/2013 | 6/27/2013 | 6/27/2013 | A | CANC |
Troy Cobbley
|
|
|
Steve did not want to test after 8:00am and the approved plans were not on site.
|
Telephone call | | | 6/24/2013 | | DONE |
Lee G Meredith
|
|
|
Received a phone call from Steve Panzetta indicatng that the horn strobes that are being replaced are at a height that are 2 inches below current requirements. These locations were existing from original installation in 1996. He stated that there are plans for the corridor to be upgraded in September of this year for the D.O.T. renovation. At that time, areas in the corridor that are lacking coverage and have incorrect mounting heights will be addressed and corrected.
|
Plan assigned to (Lee) | 6/13/2013 | | 6/17/2013 | | DONE |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 6/17/2013 | | DONE |
Lee G Meredith
|
|
|
|
Permit Ready to Issue | | | 6/17/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 6/17/2013 | | 6/17/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 6/17/2013 | | DONE |
|
|
|
|
Alarm Plan Check | 6/13/2013 | | 6/14/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/14/2013 | | PASS |
Lee G Meredith
|
|
|
|
Application received | | | 6/13/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 13 2013 1:59PM
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2013 | 6/28/2013 | | A | |
Troy Cobbley
|
|
|
7:AM requested. (discussed with Troy) Phone #: ###-#### >> Inspection requested via web by Jason Babien
|