Case Summary | | | 1/29/2014 | | |
|
|
|
|
INSP-Final Inspection | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PASS |
Forrest France
|
|
|
Verified points map has been posted, recieved record of completion forms. Fire alarm permit finaled.
|
INSP-Alarm Testing | 8/29/2013 | 9/4/2013 | 9/5/2013 | P | PART |
Forrest France
|
|
|
Completed remainder of functional testing including occupant notification, EOL, descriptors for the second floor initiating devices, ADA room coverage. One HS repaired while on site. Final pending points map to be posted at the panel per agreement.
|
INSP-Final Inspection | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PART |
Forrest France
|
|
|
Items tested today include all MP stations, SD at the common, public and employee work areas on both the first and second floors, riser supervision, elevator recall and machine room functions, RA. Verified previous correction items are finished with the exception of a points map at the panel and ADA room coverage. Need to provide descriptors for all second floor initiating devices. Notification testing to be scheduled in advance as discussed with contractor and building manager on site.
|
INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. I spoke to ray about rescheduling. Phone #: ###-####
|
INSP-Final Inspection | 8/6/2013 | 8/9/2013 | 8/9/2013 | A | FAIL |
Forrest France
|
|
|
Completed initial walkthrough. Items noted include; provide a MP at stairway #2 second floor exit door, visual notification at ADA rooms to meet guidelines per NFPA 72 table 18.5.4.6.2, adjust cd settings at notification appliances in mech. room 130 and facilities room 137, post signage at the door leading to the FACP per review note #25, post points map including location of the CO detectors, relocate HD at the elevator machine room, provide for shunt trip and include revision on operations matrix. Functional testing pending corrections and adjustments.
|
FIR-Aging Inspection | 8/6/2013 | 8/9/2013 | 8/9/2013 | A | DONE |
Forrest France
|
|
|
Duplicate inspection request
|
Telephone call | | | 7/30/2013 | | DONE |
Lee G Meredith
|
|
|
Left Gordon Goldsmith a phone message to let him know progress has stopped. Asked if he could stop by to visit owner and get an update when he is in the area.
|
Telephone call | | | 7/25/2013 | | DONE |
Lee G Meredith
|
|
|
Requested system status update from Brett Anderson. He informed me that all work is complete and pre-tested except getting an electrician on site for rewiring of shunt control circuits.
|
INSP-Conference | 7/9/2013 | 7/9/2013 | 7/9/2013 | P | DONE |
Forrest France
|
|
|
Regarding project completion to date
|
INSP-Alarm Testing | 7/2/2013 | 7/3/2013 | 7/3/2013 | P | NR |
Forrest France
|
|
|
On site visit to determine status of work in progress- FACP and NAC's installed, occupant notification verified at the first and second floors, offsite monitoring included. Noted missing MP at the 2nd floor stairway #2. Project not in condition for final acceptance testing at this time.
|
Telephone call | | | 6/19/2013 | | DONE |
Lee G Meredith
|
|
|
Mountain Alarm installer "Tim" called with an update. Installation is proceeding and they expect corridor smokes and notification operational by the end of today. Sprinkler riser should be complete by end of tomorrow. Numerous issues found. T-tapping of NAC circuits, EOL missing on NAC circuit and single stage smoke detectors not operational.
|
Issue and Print Permit | | | 6/19/2013 | | DONE |
|
|
|
|
Meeting | | | 6/19/2013 | | DONE |
Lee G Meredith
|
|
|
On site with Gordon Goldsmith of fire prevention to view progress. Mountain Alarm expecting to get sprinkler risers, hallway detection, pull stations and hallway notification functional by end of today. Finding numerous problems with t-tapped NAC circuits. They are repairing them as they find them. They are porposing to their customer to replace the existing single station detectors, as they are original install equipment from 1996. Anticipated completion is around 6/28/13
|
Plan assigned to (Lee) | 6/17/2013 | | 6/18/2013 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 6/17/2013 | | 6/18/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 6/18/2013 | | PASS |
Lee G Meredith
|
|
|
Plans approved as noted on drawings and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 6/18/2013 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 6/18/2013 | | DONE |
Lee G Meredith
|
|
|
Emailed plan review to client.
|
Telephone call | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
called Bret to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 6/18/2013 | | 6/18/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 6/17/2013 | | |
|
|
|
|
Miscellaneous action | | | 6/13/2013 | | DONE |
Lee G Meredith
|
|
|
Received revised drawings from Mountain Alarm showing locations of CO detectors and updated legend.
|