INSP-Final Inspection | 8/14/2013 | 8/15/2013 | 8/15/2013 | A | PASS |
Forrest France
|
|
|
Previously noted items verified for completion. Scope of work finished. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2013 | 7/24/2013 | 7/25/2013 | A | PART |
Forrest France
|
|
|
Rough-in inspection passed- Need to provide bags at heads, spare sprinkler at the head box, secure the control valve per IFC prior to final.
|
Permit Ready to Issue | | | 7/17/2013 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/17/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/17/2013 | | 7/17/2013 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 7/10/2013 | | 7/10/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/10/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/5/2013 | | 7/5/2013 | | DONE |
Scott Arellano
|
|
|
Applicant upload completed on 7/3/13
|
Application received | | | 7/1/2013 | | DONE |
|
|
|
|