INSP-Final Inspection | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 7/31/2013 | 8/1/2013 | 8/1/2013 | P | PASS |
Troy Cobbley
|
|
|
Piping can be covered. As-builts are needed showing the actual wall layout.
|
Issue and Print Permit | | | 7/17/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/2/2013 | | 7/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/5/2013 | | 7/5/2013 | | PASS |
Scott Arellano
|
|
|
No comments attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2013 | | DONE |
|
|
|
|
1st review completed | | | 7/5/2013 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 7/5/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 7/5/2013 | | 7/5/2013 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 7/5/2013 | | |
|
|
|
7-5-13 called Don- Curtis firesprinkler permit ready and fee given ///dld
|
Application received | | | 7/2/2013 | | |
|
|
|
|