INSP-Final Inspection | 8/15/2013 | 8/16/2013 | 8/16/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection and walkthrough.
|
INSP-Final Inspection | 8/15/2013 | 8/15/2013 | 8/15/2013 | A | PART |
Forrest France
|
|
|
Rough-in completed, inspection passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2013 | 8/9/2013 | 8/9/2013 | P | PART |
Forrest France
|
|
|
OH hydrostatic testing for the new system additions completed satisfactory. Also completed rough-in inspection.
|
Sprinkler Plan Check | 8/8/2013 | | 8/8/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2013 | | DONE |
Tim Frost
|
|
|
|
(F) Reprint permit | | | 8/8/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/8/2013 | | 8/8/2013 | | DONE |
Darla L Downs
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/8/2013 | | |
|
|
|
|
Telephone call | | | 8/8/2013 | | DONE |
|
|
|
Left message for Bret. I need to know if the new raise platform is of combustible construction. Told him the project was on hold until I heard from him.
|
INSP-Conference | 8/5/2013 | 8/6/2013 | 8/6/2013 | P | DONE |
Forrest France
|
|
|
On site conference regarding review note item #7, and conditions per NFPA 13 24.2.1.6.
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2013 | 8/6/2013 | 8/6/2013 | P | CANC |
Forrest France
|
|
|
cesar Phone #: ###-####
|
Permit Ready to Issue | | | 7/22/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/22/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/22/2013 | | 7/22/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 7/17/2013 | | 7/17/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/12/2013 | | 7/12/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/12/2013 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/10/2013 | | 7/10/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/8/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2013 2:11PM. Workflow inititiated by Plan Review.
|