INSP-Final Inspection | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | PASS |
Forrest France
|
|
|
Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the tenant remodel are okay for ceiling cover.
|
Issue and Print Permit | | | 7/17/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/11/2013 | | 7/15/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 7/11/2013 | | 7/15/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/15/2013 | | 7/15/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/15/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/15/2013 | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
called Don and left vm permit is ready and fee.
|
Application received | | | 7/11/2013 | | |
|
|
|
|