Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR13-00305
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 2714 E RHYOLITE CT
Project NameStroulf Residence
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of protecting a two level house. The inside piping is 1” CPVC and the underground piping is 1 ½” poly pipe.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/6/2014 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection10/8/201310/8/201310/8/2013PPASS
DetailsForrest France
C/N items field verified for completion. CPVC piping at the basement level now meets mfg. guidelines for exposed installation. Fire sprinkler permit finaled.
Sprinkler Plan Check10/7/2013 10/7/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/7/2013 DONE
DetailsTim Frost
Permit Ready to Issue  10/7/2013 DONE
Inspection Record Card- Fire10/7/2013 10/7/2013 DONE
DetailsTisha Gallop
Telephone call  10/7/2013 DONE
DetailsTisha Gallop
called Don at Curtis Fire and told him plan mod is ready and no fee due.
CHANGE STATUS TO (ISS)  10/7/2013 DONE
Plan assigned to (Tim)10/4/2013 10/7/2013 DONE
DetailsTim Frost
Plan resubmittals received  10/4/2013  
Received 3 copies of letter from Don Curtis to Tim Frost dated 10-3-13, 3 copies of addendum #1, 3 copies of sheet FP-01
INSP-Final Inspection9/30/201310/1/201310/1/2013APART
DetailsForrest France
Completed walkthrough- Need to install missing heads at the garage/riser areas, secure control valves at the riser, include finish pack with spare heads, calc sticker, etc. Flow switch tested okay, one missing escutcheon installed while on site. Need to provide thermal barrier or meet conditions for exposed CPVC pipe at the ground level unfinished bedroom, family room, WIC and under stair storage areas.
INSP-Sprinkler Rough-in8/5/20138/6/20138/6/2013APART
DetailsForrest France
Tenting inspection completed satisfactory- okay to cover overhead rough-in.
INSP-Sprinkler Rough-in8/2/20138/2/20138/2/2013PPART
DetailsTroy Cobbley
rough-in passed. As-builts are needed prior to a final sign off that show theactual pipe routing. Piping can not be covered until a tenting inspection has been performed. Also the underground supply is a combined service with the domestic which, as noted on the city approved plans/notes, is not United Water approved.
Issue and Print Permit  7/30/2013 DONE
Plan assigned to (Tim)7/11/2013 7/29/2013 DONE
DetailsTim Frost
Sprinkler Plan Check7/29/2013 7/29/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  7/29/2013 DONE
DetailsTim Frost
Permit Ready to Issue  7/29/2013 DONE
DetailsChristina Prado
Inspection Record Card- Fire7/29/2013 7/29/2013 DONE
DetailsChristina Prado
Telephone call  7/29/2013 DONE
DetailsChristina Prado
called Curtis to advise permit it ready and gave fees due
Miscellaneous action  7/23/2013 DONE
Emailed Don Curtis Fire Sprinkler Services, Inc. and told him specifically that a combined service went against United Water policy; a separate tap just for the sprinkler system was requied
Plan resubmittals received  7/18/2013 DONE
DetailsTisha Gallop
received three copies of application, submittal documents and plans; routed to fire
Sprinkler Plan Check7/16/2013 7/16/2013 FAIL
DetailsTim Frost
1st review completed  7/16/2013 FAIL
DetailsTim Frost
Miscellaneous action  7/16/2013 DONE
DetailsTim Frost
Emailed review to contractor
Application received  7/11/2013