INSP-Final Inspection | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work completed and passed final inspection.
|
INSP-Sprinkler Rough-in | 9/4/2013 | 9/4/2013 | 9/5/2013 | P | PART |
Forrest France
|
|
|
Overhead work at the remodel area per the permit scope is okay to cover.
|
Plan assigned to (Tim) | 7/16/2013 | | 7/17/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/17/2013 | | 7/17/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/17/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/17/2013 | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 7/17/2013 | | DONE |
Christina Prado
|
|
|
called Don to advise permit is ready and gave fees due
|
Issue and Print Permit | | | 7/17/2013 | | DONE |
|
|
|
|
Application received | | | 7/16/2013 | | |
|
|
|
|