INSP-Final Inspection | 7/25/2013 | 7/25/2013 | 7/26/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work finaled.
|
INSP-Sprinkler Rough-in | 7/25/2013 | 7/25/2013 | 7/26/2013 | P | PART |
Forrest France
|
|
|
Rough-in inspection passed
|
Sprinkler Plan Check | 7/23/2013 | | 7/23/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2013 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 7/23/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/23/2013 | | 7/23/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 7/22/2013 | | 7/22/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/22/2013 | | 7/22/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/22/2013 | | DONE |
|
|
|
Called RP and told him why the plan failed a second time. I explained in detail that all pipe sizing must be justified.
|
Miscellaneous action | | | 7/17/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Sprinkler Plan Check | 7/16/2013 | | 7/17/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/17/2013 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 7/16/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 16 2013 1:21PM
|