INSP-Final Inspection | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the grid ceilings okay for cover. Need as-built plans reflecting actual branchline and main locations. Also need to remove one existing pendent exceeding min. separation from new heads at the workroom.
|
Permit Ready to Issue | | | 7/23/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/23/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/23/2013 | | 7/23/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 7/19/2013 | | 7/19/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/19/2013 | | 7/19/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/19/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/18/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2013 1:49PM
|