INSP-Final Inspection | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | PASS |
Forrest France
|
|
|
Final walkthrough completed. Fire sprinkler permit work finaled.
|
INSP-Final Inspection | 8/26/2013 | 8/27/2013 | 8/27/2013 | A | FAIL |
Troy Cobbley
|
|
|
Alot of ceiling tile is missing and needs to be installed prior to a final sign off.
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2013 | 8/21/2013 | 8/21/2013 | P | PASS |
Troy Cobbley
|
|
|
East and west overhead systems passed hydro tests. Remaining sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at 14 training rooms and adjacent corridors as marked and initialed on approved plans okayed for cover.
|
INSP-Sprinkler Rough-in | 7/25/2013 | 7/25/2013 | 7/26/2013 | P | PART |
Forrest France
|
|
|
Fire sprinkler work at the sheetrock soffits as marked/dated on approved plans are okay to cover.
|
Sprinkler Plan Check | 7/24/2013 | | 7/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/24/2013 | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 7/23/2013 | | 7/23/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/23/2013 | | 7/23/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/23/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/23/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Application received | | | 7/18/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2013 2:09PM
|