INSP-Final Inspection | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PASS |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in | 9/9/2013 | 9/10/2013 | 9/11/2013 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at two areas as marked and dated on approved plans are approved for drop ceiling cover.
|
INSP-Sprinkler Rough-in | 8/14/2013 | 8/14/2013 | 8/14/2013 | P | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/31/2013 | 7/31/2013 | 7/31/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for area where sprinkler piping can be covered. Per the approved plans the existing pendant heads are quick responce but are actually standard responce. The contractor needs to verify with sprinkler plan review that the heads can remain standard responce.
|
Plan assigned to (Tim) | 7/24/2013 | | 7/24/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/24/2013 | | 7/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/24/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/24/2013 | | 7/24/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 7/22/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 22 2013 6:27AM
|