INSP-Final Inspection | 9/6/2013 | 9/6/2013 | 9/6/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 8/12/2013 | 8/13/2013 | 8/13/2013 | P | FAIL |
Troy Cobbley
|
|
|
Pendant heads missing in the restroom closet and corridor between the restrooms. Heads are overspaced in the Storage room and in one area in the Sales area. Ceiling is ok to install in the Sales area.
|
Permit Ready to Issue | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/12/2013 | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 8/9/2013 | | 8/9/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/7/2013 | | 8/7/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/7/2013 | | DONE |
|
|
|
Sent an email for a follow up to Bodie's email detailing what I needed and why.
|
Telephone call | | | 8/6/2013 | | DONE |
|
|
|
Left a message wiith James Marsh with CSHHQA architect. I need to know if the storage area is still inside the building scope of work. The FP contractor removed it form theirs.
|
Plan assigned to (Tim) | 7/25/2013 | | 7/25/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/25/2013 | | 7/25/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/25/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/25/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/23/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 23 2013 9:24AM
|