INSP-Final Inspection | 1/2/2014 | 1/8/2014 | 1/8/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finled. Underground flush passed.
|
INSP-Supply line flush | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 11/21/2013 | 11/22/2013 | 11/22/2013 | P | CANC |
Troy Cobbley
|
|
|
Cancel per James
|
INSP-Supply line flush | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | CANC |
Troy Cobbley
|
|
|
United Water did not turn on the underground supply line. Will need to reschedule.
|
INSP-Sprinkler Rough-in/Hydro | 11/11/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro passed. Tenting passed. Piping can be covered. Two pendants on the first floor need to be relocated so as no to be more than 10' from any one wall. These heads will be checked at the final per discussion.
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2013 | 8/27/2013 | 8/27/2013 | A | PASS |
Troy Cobbley
|
|
|
Inspection was for a cover of the underground piping. Piping can be covered. 2" poly like the others.
|
Sprinkler Plan Check | 8/2/2013 | | 8/2/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/2/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/2/2013 | | 8/2/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 8/2/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/29/2013 | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/29/2013 | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/24/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2013 9:26AM
|