INSP-Final Inspection | 11/19/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 11/19/2013 | 11/21/2013 | 11/21/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 11/4/2013 | 11/5/2013 | 11/5/2013 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush passed.
|
INSP-Supply line flush | 11/1/2013 | 11/4/2013 | 11/4/2013 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow morning.
|
INSP-Supply line flush | 11/1/2013 | 11/1/2013 | 11/1/2013 | P | CANC |
Craig D. Hanson
|
|
|
Per Mike, wants flush on Monday the 4th
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed
|
INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Troy Cobbley
|
|
|
rough-in and tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover. 2" poly like the others.
|
Sprinkler Plan Check | 8/2/2013 | | 8/2/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/2/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/2/2013 | | 8/2/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 8/2/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/29/2013 | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/29/2013 | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/24/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2013 9:52AM
|