INSP-Final Inspection | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PASS |
Craig D. Hanson
|
|
|
System pass and in service. CDH
|
INSP-Final Inspection | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | CANC |
Troy Cobbley
|
|
|
Cancel per Mike Rogers
|
INSP-Sprinkler Rough-in | 9/18/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough-in inspection passed. Piping can be covered. One head adjusted while I waited. Underground supply line flushed passed.
|
INSP-Supply line flush | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | CANC |
Troy Cobbley
|
|
|
United Water still has not turned on the underground supply water
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro for both floors passed
|
INSP-Supply line flush | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | FAIL |
Troy Cobbley
|
|
|
United water has not turned on the water supply yet
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | CANC |
Troy Cobbley
|
|
|
The underground hydro passed
|
INSP-Sprinkler Rough-in | 8/7/2013 | 8/8/2013 | 8/8/2013 | P | PASS |
Troy Cobbley
|
|
|
The 2" poly supply piping is ok to cover
|
Sprinkler Plan Check | 8/6/2013 | | 8/6/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/6/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/6/2013 | | 8/6/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 8/6/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/29/2013 | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/29/2013 | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/29/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/29/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/24/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2013 10:32AM
|