DOC - Permit Finaled | | | 10/14/2013 | | DONE |
Christina Prado
|
|
|
Per Craig Hanson
|
INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Craig D. Hanson
|
|
|
Mike Bierman is Contact Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 10/1/2013 | 10/2/2013 | 10/3/2013 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed.
|
Override - Parcel Holds | 10/1/2013 | 1/1/1900 | 10/1/2013 | | |
|
|
|
fir
|
INSP-Supply line flush | 9/4/2013 | 9/5/2013 | 9/6/2013 | P | DEFR |
Forrest France
|
|
|
Water supply not yet available to complete flushing per contractor.
|
Sprinkler Plan Check | 8/20/2013 | | 8/20/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2013 | | DONE |
Tim Frost
|
|
|
|
Override - Parcel Holds | | | 8/20/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 8/20/2013 | | |
|
|
|
|
Override - Parcel Holds | | | 8/20/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/20/2013 | | 8/20/2013 | | DONE |
Darla L Downs
|
|
|
|
Override - Parcel Holds | | | 8/20/2013 | | |
|
|
|
|
Issue and Print Permit | | | 8/20/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/30/2013 | | 7/30/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/30/2013 | | 7/30/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/30/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/30/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/24/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 24 2013 4:29PM
|
INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
Forrest France
|
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|