Case Summary | | | 1/30/2014 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/23/2013 | | DONE |
Lee G Meredith
|
|
|
documents scanned into archives.
|
INSP-Final Inspection | 8/23/2013 | 8/23/2013 | 8/23/2013 | P | PASS |
Forrest France
|
|
|
Fire alarm work passed inspection after corrections and adjustments made while on site.
|
INSP-Final Inspection | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | NR |
Forrest France
|
|
|
New notification appliances to remain consistent with the protection level of the existing system within the building.
|
1st review completed | | | 7/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 7/30/2013 | | 7/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/30/2013 | | DONE |
Lee G Meredith
|
|
|
Plans approved. Projectdox updated.
|
Permit Ready to Issue | | | 7/30/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 7/30/2013 | | 7/30/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 7/30/2013 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 7/29/2013 | | 7/29/2013 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 7/26/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2013 11:35AM
|