INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 8/23/2013 | 8/23/2013 | 8/23/2013 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|
Permit Ready to Issue | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/12/2013 | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 8/9/2013 | | 8/9/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/9/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 8/9/2013 | | 8/9/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 8/5/2013 | | 8/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/5/2013 | | 8/5/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/5/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/5/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 8/1/2013 | | 8/1/2013 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/1/2013 | | DONE |
|
|
|
Sent email saying file did not load in ProjectDox because it was too big. Ask John to resubmit with a smaller file size.
|
Application received | | | 7/29/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2013 11:14AM
|