INSP-Final Inspection | 9/27/2013 | 9/30/2013 | 9/30/2013 | P | PASS |
Forrest France
|
|
|
Previous correction items field verified, walkthrough completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/12/2013 | 9/13/2013 | 9/16/2013 | A | PART |
Forrest France
|
|
|
Inspection for cover completed at the grid ceiling areas- noted two overspaced heads in need of relocation- one at the SE corridor and one adjacent to the west side sheetrock soffit.
|
INSP-Final Inspection | 9/12/2013 | 9/13/2013 | 9/12/2013 | A | CANC |
Forrest France
|
|
|
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 8/16/2013 | 8/19/2013 | 8/19/2013 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at sheetrock ceilings as marked and dated on approved plans.
|
Permit Ready to Issue | | | 8/16/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/16/2013 | | 8/16/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 8/16/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/15/2013 | | 8/15/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/15/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 8/15/2013 | | 8/15/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 8/6/2013 | | 8/6/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/6/2013 | | 8/6/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/6/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/6/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 7/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 30 2013 1:41PM
|