INSP-Final Inspection | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/9/2014 | 1/10/2014 | 1/10/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Final Inspection | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final inspection. Rough-in passed except for two overspace pendants. See rough-in inspection notes.
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Will verify the two pendants next to the west wall are with-in 7'-6" of the wall at final.
|
Override - Parcel Holds | | | 8/6/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 8/6/2013 | | |
|
|
|
|
Override - Parcel Holds | | | 8/6/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/6/2013 | | 8/6/2013 | | DONE |
Darla L Downs
|
|
|
|
Override - Parcel Holds | | | 8/6/2013 | | |
|
|
|
|
Issue and Print Permit | | | 8/6/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 8/1/2013 | | 8/1/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/1/2013 | | 8/1/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/1/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/1/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 8/1/2013 | | 8/1/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/31/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2013 8:42PM
|