INSP-Final Inspection | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | FAIL |
Craig D. Hanson
|
|
|
FA system not ready. no pre test. doors not tied in. sprinkler system not tested
|
INSP-Sprinkler Rough-in/Hydro | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Craig D. Hanson
|
|
|
pass
|
INSP-Sprinkler Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PART |
Troy Cobbley
|
|
|
Pendant heads are overspaced in three of the below mezzanine offices. Final spacing will be verified at the final inspection. The rough-in passed for the lobby piping (need two branchline restraints) and the second floor piping.
|
Plan assigned to (Tim) | 8/7/2013 | | 8/7/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/7/2013 | | 8/7/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/7/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/7/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 8/7/2013 | | 8/7/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 8/7/2013 | | DONE |
|
|
|
|
Application received | | | 8/1/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2013 11:50AM
|