Miscellaneous action | | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/10/2013 | 12/10/2013 | 12/10/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 11/19/2013 | 11/20/2013 | 11/20/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given, with fire dept approval, until this permit is complete. Work needing done is ceiling tile installed in the HC Company tenant space and minor items on the fire sprinkler riser. Forward flush test passed inspection.
|
INSP-Final Inspection | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for a final inspection yet. However all sprinkler piping in the HC Company tenant space can be covered (rough-in passed). Overhead hydro test passed.
|
INSP-Sprinkler Rough-in | 10/9/2013 | 10/9/2013 | 10/9/2013 | P | PART |
Troy Cobbley
|
|
|
In general the rough-in passed. Noted missing retaining straps and a couple of earth quake braces. As-builts will be needed showing the changes in the main routing near the riser and the deletion of one of the 2" branchlines.
|
Issue and Print Permit | | | 9/6/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/29/2013 | | 8/29/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/29/2013 | | 8/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/29/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/29/2013 | | DONE |
Tisha Gallop
|
|
|
called Don and left vm permit is ready and fee.
|
Plan assigned to (Tim) | 8/5/2013 | | 8/29/2013 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 8/27/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/26/2013 | | 8/26/2013 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 8/26/2013 | | DONE |
Barbara Stitt
|
|
|
Called Don and told him he needs to pick up plans and re-submit on 8-26-13 @ 2:30pm//BAS
|
Plan resubmittals received | | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plans, apps, cecklists and related docs; taken to Tim for further review
|
Sprinkler Plan Check | 8/8/2013 | | 8/8/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/8/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/8/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 8/5/2013 | | |
|
|
|
|