INSP-Final Inspection | 8/19/2014 | 8/19/2014 | 8/19/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Telephone call | | | 8/19/2014 | | DONE |
Candy A. Nichols
|
|
|
called Kelsey-let know Troy Cobbley would do inspection but if he didn't remember the inspeftion or there was no sign off, they would have to do a test on the pull station.
|
CHANGE STATUS TO (ISS) | | | 8/19/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/19/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Lee) | 8/14/2014 | | 8/15/2014 | | PASS |
Lee G Meredith
|
|
|
minor change to move pull station no effect on existing calculations
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 8/30/2013 | 8/30/2013 | 8/30/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Inspection Record Card- Fire | 8/8/2013 | | 8/8/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Issue and Print Permit | | | 8/8/2013 | | DONE |
|
|
|
|
Alarm Plan Check | 8/7/2013 | | 8/7/2013 | | PASS |
Lee G Meredith
|
|
|
Plans approved per review comments 8-7-13.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/7/2013 | | DONE |
Lee G Meredith
|
|
|
Plans approved - Updated Projectdox.
|
Miscellaneous action | | | 8/7/2013 | | DONE |
Lee G Meredith
|
|
|
Emailed client review comments. I informed them that an increase in candela would be required at a few locations due to ceiling height being above 10 feet but allowed them the option of changing these locations to wall mount. If ceiling mount is maintained, calcs will need to be reviewed to insure load and voltage drop are within tolerance.
|
Application received | | | 8/5/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2013 8:49AM
|
Plan assigned to (Lee) | 8/5/2013 | | 8/5/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/5/2013 | | FAIL |
Lee G Meredith
|
|
|
Initial review failed. See review comments for further detail.
|
Inspection Record Card- Fire | 8/8/2013 | | | | |
|
|
|
|