INSP-Final Inspection | 10/1/2013 | 10/2/2013 | 10/2/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/11/2013 | 9/13/2013 | 9/13/2013 | A | FAIL |
Troy Cobbley
|
|
|
Ceiling tile is missing.
|
INSP-Sprinkler Rough-in | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Piping in bar area is ok to cover.
|
Permit Ready to Issue | | | 8/8/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/8/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/8/2013 | | 8/8/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 8/7/2013 | | 8/7/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/7/2013 | | 8/7/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/7/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/5/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2013 10:23AM
|