INSP-Final Inspection | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Forrest France
|
|
|
Final walkthrough completed acceptable. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the first floor area 1 and second floor areas 1,2,and 3 okay for drop ceiling cover.
|
INSP-Sprinkler Rough-in | 9/17/2013 | 9/18/2013 | 9/18/2013 | P | NR |
Forrest France
|
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus *Incorrect inspection request number per contractor*
|
Sprinkler Plan Check | 8/13/2013 | | 8/13/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/13/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/13/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/13/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/13/2013 | | 8/13/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 8/12/2013 | | 8/12/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/9/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2013 8:29AM
|