Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00401
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 1377 S GOLDKING WAY
Project NameUnion Square Phase 2 Bldg. 15
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a new 3 level residential building per NFPA 13R

To construct a wood frame, three story, 28,041 sq. ft., 24 Unit Multi Family. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/5/20142/11/20142/11/2014PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro9/30/20139/30/20139/30/2013APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro9/27/20139/27/20139/27/2013PCANC
DetailsTroy Cobbley
Jonothan Phone #: ###-####
INSP-Sprinkler Rough-in9/26/20139/27/20139/27/2013APASS
DetailsTroy Cobbley
overhead r/i bld 15 passed. Piping can not be covered until a tenting inspection
Inspection Record Card- Fire8/23/2013 8/23/2013 DONE
DetailsBarbara Stitt
Issue and Print Permit  8/23/2013 DONE
DetailsBarbara Stitt
Issue and Print Permit  8/23/2013 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)8/13/2013 8/13/2013 DONE
DetailsTim Frost
Sprinkler Plan Check8/13/2013 8/13/2013 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/13/2013 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/13/2013 DONE
DetailsTim Frost
Application received  8/11/2013 DONE
Application submitted via PDS Online on Aug 11 2013 2:11PM