INSP-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 2/5/2014 | 2/7/2014 | 2/6/2014 | A | CANC |
Troy Cobbley
|
|
|
overhead - jonathan Phone #: ###-#### // cancelled per Jonothan at JBL, will call back to reschedule 2-6-14 leg
|
INSP-Sprinkler Rough-in | 12/2/2013 | 12/2/2013 | 12/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Dry head installation and tenting verified. Piping can be covered.
|
INSP-Sprinkler Rough-in | 11/22/2013 | 11/22/2013 | 11/22/2013 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed. Still need tenting inspection, heat tape inspection and the dry sidewalls for the second and third floors
|
Inspection Record Card- Fire | 8/23/2013 | | 8/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 8/23/2013 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 8/21/2013 | | 8/21/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 8/13/2013 | | 8/13/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/13/2013 | | 8/13/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/13/2013 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 8/11/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2013 3:59PM
|