Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00403
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 10193 W SMOKE RANCH DR
Project NameUnion Square Phase 2 Bldg 12
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a new 2 level residential building per NFPA 13R

To construct a wood frame, Two story, 19,732 sq. ft., 16 Unit Multi Family Dwellings All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'A' & 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All work shall comply with the approved drawings, the plan review report, and all applicable codes. This building will be fire sprinkled with a 13R sprinkler system. **SRZ** DRH13-00005 CUP12-00064
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/25/20142/27/20142/27/2014APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro2/5/20142/7/20142/7/2014APASS
DetailsTroy Cobbley
overhead hydro test passed
INSP-Sprinkler Rough-in10/30/201310/31/201310/31/2013APASS
DetailsTroy Cobbley
First and second floor rough-ins passed. Can not cover piping until tenting inspection has been performed.
INSP-Sprinkler Rough-in/Hydro10/30/201310/31/201310/31/2013ACANC
DetailsTroy Cobbley
oh hydro -- Jonothan Phone #: ###-####
Inspection Record Card- Fire8/23/2013 8/23/2013 DONE
DetailsBarbara Stitt
Issue and Print Permit  8/23/2013 DONE
DetailsBarbara Stitt
Sprinkler Plan Check8/21/2013 8/21/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/21/2013 DONE
DetailsTim Frost
Sprinkler Plan Check8/14/2013 8/14/2013 FAIL
DetailsTim Frost
1st review completed  8/14/2013 FAIL
DetailsTim Frost
Miscellaneous action  8/14/2013 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)8/13/2013 8/13/2013 DONE
DetailsTim Frost
Application received  8/11/2013 DONE
Application submitted via PDS Online on Aug 11 2013 4:05PM