INSP-Final Inspection | 9/24/2013 | 9/24/2013 | 9/24/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, okay for final status.
|
INSP-Final Inspection | 9/10/2013 | 9/11/2013 | 9/12/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler modifications per the scope of work at the grid ceiling areas.
|
Issue and Print Permit | | | 8/26/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 8/20/2013 | | 8/21/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/21/2013 | | 8/21/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/21/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
called Ron to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/21/2013 | | 8/21/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/20/2013 | | |
|
|
|
|