INSP-Final Inspection | 9/13/2013 | 9/13/2013 | 9/16/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/11/2013 | 9/12/2013 | 9/12/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work at the grid ceilings in the tenant remodel area.
|
Permit Ready to Issue | | | 8/23/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/23/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/23/2013 | | 8/23/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 8/22/2013 | | 8/22/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/22/2013 | | 8/22/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/22/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/21/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2013 2:49PM
|