INSP-Sprinkler Rough-in/Hydro | 11/15/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | FAIL |
Troy Cobbley
|
|
|
No access to the building interior
|
INSP-Final Inspection | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Troy Cobbley
|
|
|
Pass per Troy
|
DOC - Permit Finaled | | | 11/15/2013 | | DONE |
Christina Prado
|
|
|
|
Miscellaneous action | | | 11/12/2013 | | DONE |
|
|
|
A new sprinkler was approved for this project TYCO TY6137
A letter was submitted indicating the engineer would not approved the hanger from the bottom of the Z purlin.
|
INSP-Final Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 | P | FAIL |
Troy Cobbley
|
|
|
Tyco heads have been installed instead of the submitted Viking, provide one additional brace at the end of the 4" main and provide letter from manufacturer to support the installation of the hangers from the bottom of the z purlins.
|
INSP-Final Inspection | 10/30/2013 | 10/31/2013 | 10/31/2013 | A | FAIL |
Troy Cobbley
|
|
|
Left voice message that I would be there in 20 or 30 minutes. Arrived at job site and nobody was there. I did speak to Scott about needing to perform a rough-in inspection for the overhead system, branchline restraints and needing manufactures ok to hang piping from the bottom of the z-purlins as previously requested
|
INSP-Final Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PART |
Craig D. Hanson
|
|
|
final good. needs data plate and bird cage on head under stairs.
|
INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Troy Cobbley
|
|
|
Above ground hydro passed
|
INSP-Supply line flush | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 10/16/2013 | 10/17/2013 | 10/16/2013 | A | CANC |
Troy Cobbley
|
|
|
Please schedule an underground RTC. Please call Trent 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 | A | PASS |
Troy Cobbley
|
|
|
Mezzanine piping is ok to cover.. I noted that light fixtures may block pendant heads based on flex/wiring locations next to pendants.
|
Sprinkler Plan Check | 10/10/2013 | | 10/10/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 10/10/2013 | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
INSP-Sprinkler Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was only for the mezzanine/office area. Resubmit plans showing the pipe routing changes to the office/mezzanine area, the use of cpvc piping and flat face bushings. No piping to be covered at this time. Also noted sprinkler main piping hangers utilizing the bottom chord of the z purlins which will need approval.
|
Sprinkler Plan Check | 9/6/2013 | | 9/6/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/6/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/6/2013 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/6/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/6/2013 | | 9/6/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 9/5/2013 | | 9/5/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/27/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2013 11:14AM
|