Case Summary | | | 2/2/2015 | | |
|
|
|
|
INSP-Final Inspection | 11/3/2013 | 11/4/2013 | 11/5/2013 | P | PASS |
Forrest France
|
|
|
C/N items verified for completion. Fire alarm work passed inspection. Permit finaled.
|
INSP-Final Inspection | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | PART |
Forrest France
|
|
|
Final pending points map, updated plan showing correct MP station location, sign at door to the FACP room, knox box, provide visual coverage at the hall to the beer cooler, one av at the waitstaff station is obstructed, provide signals report from todays inspection.
|
Issue and Print Permit | | | 9/3/2013 | | DONE |
|
|
|
|
Application received | | | 8/30/2013 | | |
|
|
|
|
Plan assigned to (Lee) | 8/30/2013 | | 8/30/2013 | | DONE |
|
|
|
|
1st review completed | | | 8/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 8/30/2013 | | 8/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/30/2013 | | DONE |
Lee G Meredith
|
|
|
Approved plans, per comments, taken to front desk for processing.
|
Inspection Record Card- Fire | 8/30/2013 | | 8/30/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 8/30/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/30/2013 | | DONE |
Barbara Stitt
|
|
|
Called Robert and told him that permit is ready & fees due on 8-30-13 @ 12:20pm//BAS
|