INSP-Final Inspection | 10/25/2013 | 10/25/2013 | 10/25/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit okayed for final.
|
INSP-Supply line flush | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
CHANGE STATUS TO (ISS) | | | 10/4/2013 | | DONE |
Tisha Gallop
|
|
|
per Troy at Treasure Valley Fire job is not done.
|
INSP-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PASS |
Troy Cobbley
|
|
|
IBR cover inspection passed
|
INSP-Sprinkler Rough-in | 10/2/2013 | 10/2/2013 | 10/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Remaining underground supply line piping is ok for cover except for the IBR (need to see thrust block).
|
INSP-Sprinkler Rough-in | 10/1/2013 | 10/1/2013 | 10/1/2013 | P | PART |
Troy Cobbley
|
|
|
The underground supply line from the street to the first fitting is ok to cover.
|
Plan assigned to (Tim) | 9/3/2013 | | 9/3/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/3/2013 | | 9/3/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/3/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/3/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 9/3/2013 | | 9/3/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 9/3/2013 | | DONE |
|
|
|
|
Application received | | | 8/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 30 2013 9:34AM
|